Public, commercial & residential EV installations

Grid connections for EV charging infrastructure.

Securing grid capacity, managing POC applications, and delivering LV/HV infrastructure design for public charging hubs, commercial fleet depots, and residential EV installations. From first assessment to energisation, we keep your charger rollout on programme.

Sound Familiar?

Tired of grid delays, DNO hold-ups, and poor coordination stalling your EV charging rollout?

  • Grid capacity not secured, risking the entire project timeline
  • DNO and IDNO delays holding up your charger installation
  • Poor cable sizing causing costly rework after installation
  • Miscommunication between charger installers and grid suppliers
Get Your EV Project on Track
Multi-Utility Delivery

What We Deliver for EV Charging Projects

Every utility your EV charging project needs, from design through commissioning.

Gas Infrastructure

Gas connections for forecourt amenity buildings and service stations serving EV charging hubs. GIRS accredited.

Learn more
Electrical Connections

Grid capacity assessment, POC applications, LV/HV infrastructure design for charger arrays. NERS accredited.

Learn more
Water & Drainage

Water connections for EV hub amenity facilities and forecourt wash bays. WIRS accredited.

Learn more
EV Charging Infrastructure

Full charge point infrastructure from grid to charger, including cable routes, ducting, and switchgear.

Learn more
Disconnections

Removal of existing utility assets on forecourt and car park redevelopments. GIRS, NERS, and WIRS accredited.

Learn more
District Heating

Heat pump connections for EV hub comfort cooling and heating systems. PEX-a pipework and energy centre integration.

Learn more
The Utility Connection Method™

Your EV Infrastructure Connection Journey

Three stages from grid assessment to live charger supply. One programme, one PM, weekly updates.

Grid capacity assessment and LV/HV design for EV charging 480 x 300px

Design

Grid capacity assessment, POC application, LV/HV infrastructure design, and DNO/IDNO liaison. All network approvals secured before groundworks begin.

Cable routes, ducting, and switchgear installation for EV hub 480 x 300px

Install

Cable routes, ducting, switchgear, transformer installation, and charger power supply connections installed by our own teams to ENA standards.

Energised EV charging hub ready for charger installer handover 480 x 300px

Commission

Testing, energisation, metering activation, and handover to charger installer. Full compliance pack and as-built drawings provided on completion.

Showcase image
Completed EV charging hub or fleet depot
with live power infrastructure
Recommended: 1200 x 560px
Proof on the Ground

See it in action

Every EV charging infrastructure connection we deliver is signed off, certified, and photographed on completion. Add real project imagery here to show prospects exactly what they are buying.

500+
Projects delivered nationwide
50
5-star Google reviews
10+
Industry accreditations
Turnkey EV Infrastructure Package

What's Included

No gaps, no guesswork, no waiting around. Everything you need from feasibility to final sign-off, under one contract.

Dedicated project manager for your EV project
Grid capacity assessment and POC application
LV/HV infrastructure design
Cable routes, ducting, and switchgear installation
DNO and IDNO liaison throughout
Weekly progress updates
Full compliance documentation and ENA standards
Phased delivery for multi-stage rollouts
Certified Provider

Fully Accredited & Committed to Safety

Every utility connection we deliver meets the highest industry standards. Worker safety, public safety, environmental responsibility, and project compliance from planning to sign-off.

WaterSafe accredited
WIAPS accredited
LRQA WIRS certified
LRQA NERS certified
LRQA GIRS certified
ISO 9001 certified
Achilles UVDB Silver Plus
Constructionline member
SSIP accredited
Acclaim accredited
Is This Right for You?

We Also Deliver For

Multi-utility connections for commercial, industrial, and mixed-use projects across the UK.

Housing & high-rise residential
Gas Electric Water

Housing & High-Rise Residential

Multi-utility connections for housing estates and high-rise towers, from 10-plot builds to 500-unit schemes.

Industrial & commercial
Gas Electric

Industrial & Commercial (I&C)

High-capacity utility supply for factories, warehouses, retail parks, offices, and logistics sites.

Mixed-use development
Gas Electric Water

Mixed-Use Developments

Integrated utility planning across combined residential, retail, and commercial spaces.

Retail & hospitality
Gas Electric

Retail & Hospitality Projects

Utility connections for hotels, restaurants, supermarkets, and service stations with tight launch windows.

Small development
Gas Water

One-Off & Small Developments

Utility connections for smaller residential builds, plot infills, and single commercial units.

Infrastructure & transport
Electric Water

Infrastructure & Transport

Utility services for train stations, airports, and other large infrastructure schemes.

Education & healthcare
Gas Electric Water

Education & Healthcare

Multi-utility connections for schools, universities, hospitals, and care homes.

Leisure & recreation
Electric EV

Leisure & Recreation

Utility connections for sports centres, holiday parks, cinemas, and entertainment venues.

Public sector & government
Gas Electric

Public Sector & Government

Utility infrastructure for council buildings, MOD sites, and public sector developments.

What Our Clients Say About Us

Rated 5.0 ★★★★★

50 Google Reviews

EV Charging Infrastructure FAQs

Frequently Asked Questions

It depends on capacity requirements. A simple LV connection for a small charger array typically takes 8 to 12 weeks from design sign-off. An HV connection requiring a new transformer can take 16 to 24 weeks. We give you a detailed programme at quote stage so you can plan your charger rollout accordingly.
Yes. We manage the full grid application process on your behalf, including Point of Connection (POC) applications to the DNO or IDNO. We handle all correspondence, technical submissions, and approval tracking so you do not have to.
Yes. We size grid connections and infrastructure for your ultimate capacity from day one. That means ducting, cable routes, and switchgear are all designed to accommodate future charger additions without costly rework. Phased delivery is also available for multi-stage rollouts.
No. We deliver the power infrastructure from the grid to the charger connection points, including cable routes, ducting, switchgear, and transformer installation. Your charger supplier installs the charge point units. We work closely with charger installers to ensure a seamless handover.
Yes. We work across the full range of EV charging projects, from single dwelling residential installations through to 30MW-plus public charging hubs. Whatever the scale, the process is the same: grid assessment, design, installation, and commission.
Yes. We deliver EV charging grid connections and power infrastructure across England, Scotland, and Wales. Whether you are rolling out a fleet depot in the Midlands or a motorway services hub in Scotland, we have the accreditations and network relationships to deliver.
Get Started

Ready to Power Your
EV Charging Project?

Tell us about your project and we will send you a free, no-obligation EV infrastructure plan within 24 hours.

100% free, no obligation Response within 24 hours 5.0 from 50 Google reviews

Prefer to talk? Call 024 7542 6505 for immediate service.

Get a Quote